In an effort to finish the driver’s side of the interior, I prepared a molding for the bottom of the Murphy bed and started to replace the fill dish and hoses at the fresh water tank.
The wardrobe side wall also got a Formica finish. In addition, I started on a long-term project: a small oil painting of a Mondriaan piece for the Murphy bed. As the oil paint needs to dry completely between applications, this will take a couple of months to accomplish. Next week, the main push is to apply Formica to the Murphy bed.